ShopDreamUp AI ArtDreamUp
Deviation Actions
Description
The idea behind this image is an upgrade of a double-lane road and bridge to a four-lane road and bridge. Creatively, it was challenging to come up with how the preexisting roadworks would influence the additions.
The erased lines of the original intersection are still faintly visible, and should give a rough idea of what the roadworks looked like. I enjoy the extras that I added to this - trees, construction equipment, and graffiti under the bridge(!).
The erased lines of the original intersection are still faintly visible, and should give a rough idea of what the roadworks looked like. I enjoy the extras that I added to this - trees, construction equipment, and graffiti under the bridge(!).
Image size
773x1000px 256.52 KB
© 2007 - 2024 StudioOtaking
Comments0
Join the community to add your comment. Already a deviant? Log In