Site Header
Deviation Actions
Badge Awards
Description
Current layout of the Phalanx hangar. It is ~500m long, so lots of room!
Each image shows one subsection:
TL: Entry/exit and deployment rails
TR: Shuttlebay
BL: Maintenance and Preparation
BR: Storage
The rails for the Ties basically connect from the front to the back, so they can be transferred with minimal effort. The Neutralizers seem unfit to hang up so i gave them some carts to move them around, which doubles as a storage and loading solution. The returning Ties should probably be caught with robotic arms or tractor beams, because reverse parking onto those attachments is probably quite tricky to do manually^^
LOL. I love TIE's because they kind of lean into that min/maxing design philosophy that probably sounds great on paper, but when it comes time to use it, education starts happening.


































![[WIP] Command bridge, alert condition red!](https://images-wixmp-ed30a86b8c4ca887773594c2.wixmp.com/f/c32782cd-0690-4e76-853f-6bc4de0a0d95/dd4ns9t-cb6870c7-e610-4385-990e-c665722a4b5c.png/v1/crop/w_184)





