ashleytinger's avatar

Challenger Bridge - Phase II WIP 03

By ashleytinger
7 Favourites
0 Comments
42 Views
A lot of little detail work to spruce up the railings a bit (had to attach the endcaps) and then a lot of measuring, refining and then cursing, cutting, redrawing, etc. to get the railing supports done up.

The Challenger floor is a little higher at that point than the TMP bridge so these may not work without some edit on the TMP bridge, but things are at least progressing.
IMAGE DETAILS
Image size
1600x1800px 427.29 KB
Published:
© 2020 ashleytinger
Comments0
anonymous's avatar
Join the community to add your comment. Already a deviant? Log In